FORS Bronze achieved in week 9 — first time, zero action points.
The challenge
A 24-vehicle construction logistics operator had been required to achieve FORS Silver within 16 weeks as a condition of a major Tier 1 contractor agreement. They had no existing compliance infrastructure — no SUD policy, no documented maintenance system, no fuel monitoring, no vehicle safety equipment on older vehicles. The operator had also never held any FORS accreditation.
What we did
J&JL Ltd began with a comprehensive gap analysis covering all v7.1 Bronze and Silver requirements simultaneously. We built the full documentation suite, sourced and specified compliant V6 equipment for vehicles not yet fitted, trained the management team, established fuel monitoring processes and conducted a full mock Bronze audit before the official audit. Immediately post-Bronze, we began Silver preparation.
The outcome
FORS Bronze achieved in week 9 — first time, zero action points. FORS Silver achieved in week 15 — within the client deadline and also first time. The operator retained the Tier 1 contractor agreement and subsequently used the FORS infrastructure to secure two further contracts specifying Silver as a minimum requirement.